T. Framing Manual-Simplified Non-Cyclonic Part 4 2010
The objective of this standard is to provide the building industry with procedures that can be used to determine building practice, to design or check construction details, and to determine members sizes, and bracing and fixing requirements for timber-framed construction in non-cyclonic wind classification N1 and N2.
Postage Charges |
Postage Type | Charge | Estimated Delivery Time |
Express Post | Less than $100 spent | $16.00 | 1-2 working days |
Registered Post | | $14.00 | 2-3 working days |
No Postage Required | Collection from: 332 Albert Street, East Melbourne | Free | You can purchase products in-store from our East Melbourne office between 8:30am – 5:00pm Monday to Friday. |
*If you have not received your order within the advised timelines, please check with your local post office as some larger items that will not fit in a standard letterbox will be taken direct to the Post Office without a note to the address.