Icon
Excellence in Construction of Industrial Buildings
About the winning project
The main works of the Aurora project consist of two divisions known as the Base Fractionation Facility (BFF) and the Warehouse, Freezer, Links and Hubs (WHF) projects. The delivery of the main works also included many satellite projects designed to develop the site and to provide supporting infrastructure to both the BFF and WHF buildings. This includes extensive infrastructure works across the site, including upgrades to utilities, construction of a new electrical switch room, pump house, roadways, carparking, pipe racks, boiler house and a separate tank farm (trade waste processing, ethanol storage and recovery areas). The BFF is a four-level manufacturing facility comprising of a specific process waters and utilities area, Grade C to D cleanroom manufacturing areas, plant areas for air handling systems, and associated administration and office areas. The BFF building ties directly into the south of the WHF. The WHF is a mixed-use five-level pharmaceutical facility that streamlines site operations and supports the wider site.